Client        Japan International Cooperation Agency (JICA)

Duration     From September 2009 to March 2010 (Phase I)

                     From April 2010 to January 2011 (Phase II)

Project Summary

The objective of the Project is to build a wide area water pipe network as well as to increase production of drinking water by sea water desalination and developing water supply network to meet water demand for economic development.

Services

  • Assessment of existing network,
  • Socio-economic condition survey,
  • Capacity assessent of executin agencies,
  • Natural condition survey,
  • Social and environmental condition survey,
  • Financial coordination
  • Assistance of basic design