Client            Japan Internation Cooperation Agency (JICA)/Government of Ghana

Duration       From March 2008 to

Description of Project

Project Summary

-Project Type                   Improvement of Trunk Road

-Total Lengh                   59.9km

-Width                              11.3m

-Main Structure              Superstructure : PC 3 span continuous rigid frame bridge

                                              (L=98m)

                                             Substructure : abutment – deep foundation

                                              (dia. 2.00m, c=10-11m)

                                              pier – spread foundation

-Other Structure            127 culverts